Steering
Easy fold handles collapse within 2 seconds
Easy fold handles collapse within 2 seconds
Deck Construction
Large 21 in. heavy-duty steel
Large 21 in. heavy-duty steel
Discharge
3-in-1 for mulching, bagging or side discharge
3-in-1 for mulching, bagging or side discharge
Mowing Time
Run time - Up to 70 min. (Depending on battery size, charge level and operating conditions)
Run time - Up to 70 min. (Depending on battery size, charge level and operating conditions)